Laserfiche WebLink
TABLE 6. 1 MINING AND RECLAMATION TIMETABLE FOR 36 AFFECTED AREAS <br /> ACRES AFFECTED (BONDED) OR RECLAIMED (BOND RELEASED) AT END OF PHASE <br /> A = Affected R = Reclaimed <br /> AREA # DESCRIPTION OF AREA I II III IV V <br /> 1976-77 1978-82 1983-95 1996-2020 2021-30 <br /> A R A R A R A R A R <br /> ** GRAND TOTAL - - 7671 0 7811 250 5108 2452 0 5108 <br /> 1 Open Pit, Haul Road , Stockpiles - - 1154 0 1165 100 400 765 0 4001 <br /> Subsidence <br /> 2 Cirque Dump and Haul Roads - - 133 0 63 70 0 63 0 0 <br /> 3 Camp Topsoil Stockpile - - 1 0 0 1 0 0 0 0 <br /> 4 Arkansas Aggregate Area - - 154 0 154 0 0 154 0 0 <br /> 5 Climax Camp and Stor. ke - - 524 0 722 0 522 200 0 522 <br /> 6 McNulty Dump and Haul Roads - - 368 0 368 75 0 368 0 0 <br /> 7 McNulty Topsoil Stockpile - - 4 0 0 4 0 0 0 0 <br /> 8 West Service Corridor - - 386 0 386 0 386 0 0 386 <br /> 9 Buffehrs Quonset Facility - - 6 0 6 0 6 0 0 6 <br /> 10 East Service Corridor - - 250 0 245 0 243 0 0 243 <br /> 11 Buffer - - 64 0 64 0 64 0 0 64 <br /> 12 Low Grade ore Stockpile - - 199 0 199 0 199 0 0 199 <br /> 13 Robinson Tailing Pond - - 677 0 677 0 327 350 0 327 <br /> 1 No reclamation. <br />