Laserfiche WebLink
fine ore bin to complete milling processes of primary grinding <br /> in ball mills, primary concentration by flotation, cleaner <br /> concentration and then filtering , drying and packaging. <br /> Circuit improvements will occur in keeping with the highest <br /> technologies. Most of the product is shipped to Climax' s <br /> domestic and foreign conversion plants. By-products include <br /> tungsten, tin and pyrite concentrates. Slurried tailing from <br /> the mill is delivered by gravity to three tailing deposition <br /> ponds. <br /> 2. 7 TAILING DEPOSITION <br /> Tailing deposition sites include the Robinson Tailing <br /> Pond (.13) _(approximately 861 acres including its two Dams , No. <br /> 1 and No. 2 Dams ( 14 and 15 ) , located directly north of the <br /> mill site upon the natural divide between the Eagle River and <br /> Tenmile Creek drainages ; and the Tenmile Tailing Pond (22) <br /> ( approximately 613 acres including its Dam, No. �3 Dam (23) ) <br /> located at a lower elevation north of, and contiguous with the <br /> Robinson Tailing Pond; and the Mayflower Tailing Pond (31 ) <br /> ( approximately 406 acres including its Dam, No. 5 Dam) located <br /> approximately five miles north of the mill at a lower elevation <br /> than the Tenmile Tailing Pond . Its ultimate acreage will be <br /> 1 , 280 acres including its Dam. The crest of the No. 5 Dam will <br /> be approximately 515 feet high and have an overall face slope <br /> of 4: 1 . No. 1 , No. 2 and No. 3 Dams have face slopes of <br /> approximately 3: 1 . <br /> The Robinson Tailing Pond will remain active probably <br /> through the midyears of Phase III or approximately 1990 , while <br /> the Tenmile and Mayflower Tailing Pond will function for the <br /> life of the mine. Approximately 75,_000 . oubic_ yards of topsoil <br /> have been stripped from the Mayflower tailing area to date . A <br /> total of approximately 300, 000 cubic yards will be stripped <br /> fr-or�_-the__area during Phases II and III . The topsoil will be <br /> _sired immediately for reclamation purposes or stockpiled ( 35 ) <br /> for the near future reclamation projects. <br /> 2-9 <br /> f <br />