Laserfiche WebLink
available , and then seeded with the Climax seed mixture. A <br /> suitable inorganic fertilizer scheme will substitute for the <br /> sewage sludge if necessary. The more inaccessible areas on the <br /> dam face will be reclaimed with methods described for. No. 1 , No. <br /> 2 , and No. 3 Dams. <br /> Sections of both the tailing surface and dam face will <br /> be planted to shrubs and trees during the second year of <br /> revegetation. <br /> A maintenance program is expected not to exceed five to <br /> seven years. Reclamation for flood control was discussed in <br /> Section 8 , WATER. <br /> 10 . 29 MAYFLOWER PUMPS , TREATMENT PLANT, SPILL PREVENTION DAM (33 , <br /> 34 ) <br /> These facilities , including dams, ponds, treatment <br /> plants, canals, roads, etc. , will remain to function as a <br /> post-mining water treatment facility if determined necessary. The <br /> area will be revegetated if not already adequately vegetated prior. <br /> to Phase VI . Unnecessary facilities will be dismantled and <br /> salvaged. Unsalvageable materials such as concrete will be <br /> blasted and buried . <br /> LP areas will remain for water catchment and flood <br /> control , and their slopes, from five feet above to ten feet below <br /> the water surface , will not exceed a 3: 1 ratio. If the <br /> development of a fishery is feasible, the Division of Wildlife <br /> will be consulted for final reclamation. The area will be <br /> landscaped to meet provisions of adequate drainage. Final <br /> revegetation will consist of the Climax seed mixture , an initial <br /> fertilizer and hydromulch during the first year . During the <br /> second year. , trees and shrubs will be planted . <br /> 10-22 <br />