My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-04-12_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2001-04-12_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:41:58 PM
Creation date
1/31/2013 6:59:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
4/12/2001
Doc Name
Revised Approval Letter- FAX
From
DMG
To
Climax
Type & Sequence
SR3
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Letter to Bryce Romig 6 April 12, 2001 <br /> ®RAFT <br /> $117,387' + $409,1652+ $735,6913 + $1,734,0944 + $2,5175 + $79,4376 = $3,078,291 <br /> 1•Storke,2:E-Dump,3:3-Dam,4:Robinson Tailing Flats,5:Area C-14,6:Building Demolition <br /> Based on this reduction of direct reclamation costs, the indirect costs applied as a percentage may also <br /> be reduced in the total amount of bond to be required. The indirect cost reduction factor is calculated as <br /> follows: <br /> Total Direct Cost Reduction: $3,078,291 <br /> Indirect Costs: <br /> Public Liability Insurance (1.55%) $47,714 <br /> Contractor's Performance Bond (0.86%) $26,473 <br /> Contractor's Profit (10.0%) $307,829 <br /> Subtotal Indirect Costs $382,016 <br /> Subtotal Bond Reduction Amount $3,460,307 <br /> Minerals Program Administration (5.0%) $173,015 <br /> Total SR-03 Bond Reduction $3,633,322 <br /> Climax may provide a replacement bond or a rider to the existing $52,365,000.00 bond to reflect this <br /> reduction. Alternatively, Climax may chose to await the resolution to the pending financial warranty <br /> review to be conducted in accordance with Rule 4.2.1(2) and adjust the bond amount one time as the <br /> result of the two separate financial warranty actions. <br /> If you have any questions, please contact me. <br /> Sincerely, <br /> Allen C. Sorenson <br /> Reclamation Specialist <br /> enclosure(s) <br /> cc: Barb Chiappone, DMG (w/o enclosures) <br /> c:\wmdows\personal\climax sr-3 appvl revised.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.