My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-24_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-01-24_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:21 PM
Creation date
1/25/2013 12:44:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/24/2013
Doc Name
Weekly CQA Report: Week Ending 1/12/2013.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />E.Cresson Clay Process <br />0 <br />81,150 <br />SLF processing is temporarily paused <br />Total <br />0 <br />81,510 <br />SLF processing is temporarily paused <br />Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />Total <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />C) Soil Liner Fill (SLF) <br />Soil liner fill placement is complete for the Mill Site Earthworks project. This figure has been <br />removed from the weekly reports. <br />D) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) is complete. <br />II) Geosynthetics <br />A) Geomembrane <br />No work performed during the week. <br />III) Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />IV) MSE Wall Construction <br />Fill temperatures averaged between 26.3 °F and 42 °F thru the week. <br />Wall #2 <br />Completed during day shift on Friday December 12.07.12 at approximately 1200 hrs. <br />amee <br />Wall #1 <br />Installation of wall components for Mat No.s 25, 26, 27, 28 and 29 was performed. An Amec field <br />representative inspected and approved placed backfill materials when placed, which was <br />determined acceptable per the plans and specifications. Acceptance to begin the installation of <br />wall components for Mat No. 30 was given. <br />An Amec field representative monitored fill material temperatures thru the working shift as <br />needed. The backfill material temperatures were above 32 °F during the shift. However on Friday <br />the 11 we were notified that the heaters being used are not operating as needed. We were <br />informed a replacement heater will be used if the heaters will not operate as needed. During this <br />shift backfill materials were considered frozen and it was recommended not to proceed until <br />materials were approved for placing the next mat. <br />MEW Weekly Report WE 01.12.2013.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.