My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-24_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-01-24_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:21 PM
Creation date
1/25/2013 12:44:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/24/2013
Doc Name
Weekly CQA Report: Week Ending 1/12/2013.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />- <br />- <br />N <br />N <br />N <br />N <br />- <br />- <br />D = Day Shift N = Night Shift <br />MILL SITE EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: Mill Site Earthworks <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Mill Site Earthworks <br />Date: January 12, 2013 <br />Reporting Period: 01.06.2013 thru 01.12.2013 <br />Ambient Temperature Range ( °F) <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />Low: -9 °F to 25 °F ( + / -) <br />Project No.: 74201125K0 <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day /Night <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />High: 7 °F to 45 °F ( + / -) <br />Ames: We were notified by the contractor on Friday the 11 at approximately 1500 hrs that no night shift <br />will occur at all and no Saturday the 12 shift will occur due to current weather conditions and that day <br />shift only will be in operation. <br />I) Earthworks <br />A) Overburden Fill Placement <br />Overburden fill material was delivered from CC &V Mine Operations throughout the day shift. An <br />Ames CAT D -10 dozer was used to maintain the borrow area. A CAT 992 (250601) and CAT 988 <br />(250703) front -end loader were used to load overburden fill material into 777 haul truck's and CAT <br />40 -ton articulating haul trucks. <br />Overburden fill was placed in the areas shown on Figure 1. DCF depth was checked by survey <br />and the area was approved prior to fill placement above DCF. Overburden fill was placed in 36" to <br />40" lifts using various CAT dozers. Each lift was moisture conditioned using a tandem axle water <br />trucks (when necessary) and compacted using a 10 -ton vibratory smooth drum compactor, <br />passing over the entire fill surface at least 4 times (method compaction technique was applicable). <br />Amec field representative monitored fill material placed during the shift's. Average fill <br />temperatures averaged between 32.5 °F and 42 °F. <br />amec <br />B) Slope Contouring <br />Slope contouring of placed overburden fill was performed using a CAT 312 (310603) and a Cat <br />330 (310617) excavator. Material generated during slope contouring was placed as overburden <br />fill at the top of the slope. <br />MEW Weekly Report WE 01.12.2013.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.