My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-18_PERMIT FILE - M2012048 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012048
>
2013-01-18_PERMIT FILE - M2012048 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:12 PM
Creation date
1/23/2013 3:14:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012048
IBM Index Class Name
PERMIT FILE
Doc Date
1/18/2013
Doc Name
PRELIMINARY ADEQUACY REVIEW
From
DRMS
To
RANDY SCHAFER
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Please add to the text of this exhibit a statement that there is no overburden on the site <br />(assuming such statement is accurate). <br />3. Please specify the estimated thickness of the material that will be mined. <br />4. Please specify the dimensions of any significant existing disturbance to the land surface. <br />The application mentions a previously mined pit. Please provide information such as length, <br />width and depth, of the previously mined area. <br />5. Specify the dimensions of the existing road. Please provide information such as the length <br />and width of the existing road. Also, will there be any improvements made to the road, will <br />the road need to be widened to accommodate more traffic. <br />6. Please clarify the meaning of this statement "Mining is anticipated to a depth of around 20 <br />feet below the outside perimeter of the pit boundaries." <br />6.3.4 Exhibit D- Reclamation Plan <br />7. Please specify the thickness of the overburden that will be replaced. If there is no <br />overburden, please state that in the reclamation plan for this exhibit. <br />6.3.5 Exhibit E — Map <br />8. The map titled "Exhibit E — Mining Plan" shows the elevation of the hill as being 4470 feet. <br />The map titled "Exhibit E — Final Contour Plan" depicts the final elevation of the pit floor at <br />4430 feet. This would result in a mining depth of 40 feet. However the mining plan stated a <br />mining depth of only 20 feet, please explain or correct this discrepancy. <br />9. The elevation shown in the northwest corner of the permit area on the Exhibit E — Final <br />Contour Plan (4450 feet) is higher than the elevation shown in that area on the Exhibit E — <br />Mining Plan (4440 feet). Will reclamation increase the elevation in the northwest corner of <br />the permit area? <br />General comments <br />10. Rule 3.1.10(6) requires a weed control plan for all prohibited noxious weed species, and <br />whenever invasion of a reclaimed area by other weed species seriously threaten the <br />continued development of the desired vegetation. Please submit a weed management <br />plan that fulfills the requirements of Rule 3.1.10(6). <br />This concludes the Division's preliminary adequacy review of this application. Please remember <br />that the decision date for this application is February 8, 2013. As previously mentioned, if you <br />are unable to provide satisfactory response to any inadequacies prior to this date, it will be <br />your responsibility to request an extension of time to allow for continued review of this <br />
The URL can be used to link to this page
Your browser does not support the video tag.