Laserfiche WebLink
demonstrate to the Division how it will contain runoff within the confines of <br />the pit. <br />Nonetheless, Colowyo is required under MSHA standards to have berms that <br />are half the axle height to the largest equipment that will potentially utilize an <br />elevated roadway. The roadway on the North side of the temporary spoil pile <br />will be bermed accordingly which will not allow any surface drainage to the <br />West Taylor Pond. Colowyo will manage this water into the South Taylor Pit <br />as it deems necessary through use of the berms, ditches, and /or pumping. <br />If you should have any additional questions relating to the responses above, please <br />feel free to contact me at your convenience at (970) 824 -1232. <br />Sincerely, <br />Tony Tennyson <br />Senior Engineer - Environmental <br />Encl. <br />Cc: file CF 1.1.2.87 <br />COAL <br />COMPANY 04 <br />.�pta.raoaoctto�'� <br />A Western Fuels - Colorado, LLC mining property <br />