Laserfiche WebLink
Seneca II -W Mine <br />TR -79, Adequacy Review Response <br />Page 2 <br />5. Also on Tables 13 -5 and 13 -7 -1, culvert K -1 remains on this table. This culvert was removed with <br />the implementation of the Pond 016 area slide remediation plan. The tables should be updated <br />accordingly. <br />Response: Table(s) 13 - 5 and 13 - 7 - 1 have been revised to show that culvert K - 1 has been removed. <br />6. The design information for culvert PM -18, for Attachment 13 -7, should have page numbers. <br />Please revise the design to include pagination. The Division's copy of the permit application <br />package indicates that the first page of design should begin with 13 -7 -274. <br />Response: The design information for Culvert PM -18 has been hand paginated beginning with page 13- <br />7 -274. <br />7. Included with the revision are revised pages 20 -2.1 and 20 -2.2 of Attachment 20 -2; Permanent <br />Structure Documentation. These pages indicate the As -built profiles and cross - sections of these <br />roads are located in Tab 13, Facilities. However; also included with this revision are Post Mine <br />Road Profiles for the Mine Entrance Road, Road A, Road J and Road K in Exhibit No. 20 -3; <br />sheets 1 and 2. For these roads, please revise Pages 20 -2.1 and 2.2 to reference the location of <br />the post mine profiles depicted on Exhibit No. 20 -3. <br />Response: Pages 20 -2.1 and 2.2 have been revised to reference the location of the post mine profiles <br />depicted on Exhibit No. 20 -3. <br />8. Page 20 -2.3 was not proposed for revision, but it is not current and should be revised. The page <br />includes reference to Road LU -2, which has been reclaimed and is no longer proposed as a <br />permanent road <br />Response: Page 20 -2.3 has been revised. <br />9. According to the currently approved Attachment 20 -D for the Pond 016A removal, geotextile <br />placement will be placed across the fill of the underdrain. No mention of the geotextile placement <br />was included with this section of the revised Attachment D. Please clarify, was geotextile installed <br />in accordance with the approved plan? If so, please revise the attachment indicating this <br />occurred or submit justification for the omission of the geotextile installation. <br />Response: As stated in the Pond 016 Slide Area Construction Summary, all of the saturated material was <br />removed and dry material was placed and compacted throughout the area. Therefore, once all of the <br />saturated material was removed, the underdrain installed and dry material placed and compacted from the <br />pond bottom up to final grade; there was no need for the geotextile originally proposed. <br />It should be noted that the originally proposed backfill material up to the top of the underdrain was not to <br />be compacted. However, all the backfilled material placed in the Pond 016A area was compacted <br />Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 276 -5219 • FAX (970) 276 -5222 <br />