My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-13_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-05-13_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:13 PM
Creation date
1/17/2013 12:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
5/13/2008
Doc Name
COMMENTS AM09
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
earlier harvesting, those areas have Reclaimed themselves and are now <br />mature. The residents and visitors of Cripple Creek enjoy their beauty and <br />a significant number of visitors come to this area to enjoy the turning of the <br />aspens. It would be disingenuous for CCV to say there was no economic <br />knpact to Cripple Creek for the harvesting. <br />Further the plan they propose wN1 provide years of simply ugly mining <br />The proposed reclamation plan chooses to leave an entire <br />benched Rock Face with no vegetation, which begs the questoni Iow is <br />that Rsclanatlon'. It Is undoubtly an insult to the City and the common <br />sense of our society. <br />POINT FOUR - LIVING UP TO THEIR PROMISES <br />CCV should be doing what their representatives have told Cripple Creek <br />and Victor that they promised from the beginning ing and that it would be <br />redeveloping the downtown of Victor. They have supported the Lowell <br />Thomas Museum but a lot is left to be done, and there is virtually no <br />redevelopment sponsored by the mine. <br />-POINT FIVE -A COMP NSIVE 1D1 N FOR <br />RECONSTRUCTING THE TRAIN TO VICTOR :. <br />CCV needs to be fostering a plan for a train from Cripple Creek to Victor <br />and not in 10 or 20 yeas, the plan needs to be now and the execution <br />needs to begin over the next two or three yews. <br />GINN <br />POINT SEVEN NOISE �rT!G TION FROM r ASTfai G <br />OPERATIONS <br />CCV Mme Permit Comments <br />City of Cripple Creek <br />June 11, 2008 <br />Page 4 <br />RESTORE AND RELOCATE TH'E ANTIOUrr1ES - - <br />CCV reeds to preserve, protect and restore all of the antiquities under their <br />stewardship, either in place or by relocation to a heritage village - perhaps <br />along the rill routs or in poverty gulch. Special language for this needs to <br />be Holly Implemented In a short period of time, with the mine's specific <br />commitment in place prior to the approval of the mine expansion plan. <br />CCV Shall provide a Map old* blasting area's that are within one mile of <br />Cripple Creek City limits, where their monitoring stations are to be located <br />
The URL can be used to link to this page
Your browser does not support the video tag.