Laserfiche WebLink
Page 2 <br />DRMS / Cross Gold Mine / Map Legend / November 03, 2012 Annual <br />Report <br />B: Location "B" marked on the map is on the historic Cross Mine <br />dump, driveway area just east of the main shop building. <br />Approximately 300 tons of development rock from cross cutting / <br />tunneling work was stockpiled at this location. The material is ultra - <br />hard quartz monzonite, volcanic host rock. It is non -acid generating <br />and ranges in size from 16 inch to minus tolls inch. The waste <br />monzonite rock will be crushed at a future date and will be used for <br />road base to improve the Cross Mine road system. <br />C: Location "C" shows the underground area on the Tunnel Level of <br />the Cross Mine where small scale production work took place on the <br />Intermediate Apache vein. The location is also where the <br />development tunnels were being driven to hit the North Apache /Gold <br />Coin vein systems. This area is 1100 feet in from the mine portal and <br />at an elevation of 9,714 feet above sea level. Work stopped as <br />reported on April 03, 2012 for lack of funding. <br />E: Location "E" is where old cabin 2 sat which we received full <br />approval from Boulder County to take down and remove. At this <br />location of historic disturbance, we stockpiled both quartz monzonite <br />volcanic host rock and ore encountered from the North Apache break <br />through tunneling. This rock will be sorted in the future for both <br />waste rock and ore to be milled in a future mill. Approximately 220 <br />tons are stored in this location. <br />