Laserfiche WebLink
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />January 10, 2013 <br />Mrs. Carrie Herbolsheimer <br />Applegate Group, Inc. <br />1490 W. 121 Avenue, Suite 100 <br />Denver, CO 80234 <br />Re: Bucklen Equipment Company Pit, File No. M- 1982 -131 <br />Technical Revision No. 1— Second Adequacy Review Letter <br />Dear Mrs. Herbolsheimer, <br />Mined Land Reclamation <br />STATE OF COLORADO <br />The Division is required to make an approval or denial decision no later than February 4, 2013 <br />therefore; a response to the following adequacy review concerns should be submitted to the <br />Division as soon as possible. <br />6.4.19 EXHIBIT S - Permanent Man - made Structures <br />Where the mining operation will adversely affect the stability of any significant, valuable and <br />permanent man -made structure located within two hundred (200) feet of the affected land, the <br />applicant may either: <br />c. where such structure is a utility, the Applicant may supply a notarized letter, on <br />utility letterhead, from the owner(s) of the utility that the mining and reclamation <br />activities, as proposed, will have "no negative effect" on their utility. <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta Pineda <br />Director <br />The Division of Reclamation, Mining and Safety (Division) has reviewed the content of the response <br />to Technical Revision No. 1 Adequacy review letter dated December 18, 2012 for the Bucklen <br />Equipment Company Pit, File No. M- 1982 -131 and submits the following comments. <br />• Questions #1 -3 from the Division's Adequacy Letter dated August 28, 2012 were answered <br />satisfactorily by the Applicant in the response. <br />a. provide a notarized agreement between the applicant and the person(s) having an <br />interest in the structure, that the applicant is to provide compensation for any <br />damage to the structure; or <br />b. where such an agreement cannot be reached, the applicant shall provide an <br />appropriate engineering evaluation that demonstrates that such structure shall not <br />be damaged by activities occurring at the mining operation; or. <br />Office of Office of <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />