My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1996083 (7)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
_INSPECTION - C1996083 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 7:52:01 AM
Creation date
1/14/2013 8:38:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DRMS
To
Bill Bear
Inspection Date
1/9/2013
Email Name
SLB
SB1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 9, 2013 C-1996-083/13owie No. 2 Mine SLB <br /> W � . <br /> 1 � <br /> -Jw <br /> - <br /> � <br /> Portion of aerial photograph of Gob Piles#2 and#4 taken on January 4, 2013. Upper blue <br /> line indicates approved location of diversion ditch. Lower green line indicates approximate <br /> edge of currently approved disturbance area. <br /> PROCESSING WASTE/COAL MINE WASTE PILES—Rule 4.10 and 4.11❑ Drainage Control; Surface <br /> Stabilization; Placement: <br /> Refuse was being placed in Gob Pile #2 at the north end on the upper bench and on the second bench <br /> adjacent to the topsoil stockpile. The refuse being placed was too wet to properly compact, so the operator was <br /> end dumping the material to allow it to dry out. Care should be taken when end dumping takes place to prevent <br /> the impoundment of water on the pile to ensure stability of the area. <br /> ROADS—Rule 4.0311 Construction 4.03.l(3)/4.03.2(3)❑ Drainage 4.03.1(4)/4.03.2(4)11 Surfacing and <br /> Maintenance4.03.1(5) and(6)/4.03.2(5) and (6)11 Reclamation 4.03.1(7)/4.03.2(7): <br /> The main haul road had been cleared of snow and was dry. The haul road to Gob Pile 42 was extremely <br /> muddy. The Terror Creek Fan Access Road was snowy and slushy,but passable. <br /> Number of Partial Inspection this Fiscal Year: 9 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 4 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.