Laserfiche WebLink
January 9, 2013 C-1996-083/13owie No. 2 Mine SLB <br /> application for the unauthorized disturbance between Gob Piles 42 and 44, and failure to obtain final approval for <br /> a revision prior to its implementation. The Division is currently reviewing a technical revision application(TR- <br /> 76)that would provide for expansion of Gob Pile 42. Final approval for the revision has not yet been granted,but <br /> disturbance proposed under the revision had commenced. <br /> A roadway had been constructed across an area not approved for disturbance. The operator indicated the roadway <br /> was utilized to access rip rap for the East and West Diversion ditches that were previously approved for <br /> construction. The disturbance is approximately 400' in length and 130' wide,totaling roughly 1.2 acres. <br /> �ga Figure at left depicts currently approved <br /> Gob Pile #2 configuration. Blue line <br /> x indicates location ofdiversion ditch <br /> approved in Minor Revision No. 132 <br /> l t <br /> Figure at left depicts proposed Gob Pile <br /> � a �# #2 expansion area currently under <br /> � ' - t <br /> > 1 _ review with Technical Revision No. 76. <br /> f _ � <br /> Number of Partial Inspection this Fiscal Year: 9 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 12 <br />