Laserfiche WebLink
ameO <br />was not present in the fill. AMEC continuously inspected geomembrane during BF placement, <br />and marked areas for repair, if required. If needed, any repairs were documented and AMEC <br />verified the repairs were completed. After final grading, AMEC monitored removal of PVC grade <br />markers. <br />4.2.5 Temperature Monitoring <br />AMEC monitored ambient air temperatures using a digital thermometer. Temperatures were <br />monitored throughout the day. The lowest and highest daily temperatures are summarized in <br />Table 2. <br />12 <br />