Laserfiche WebLink
Operational Fluid Level Limitation <br />At all times the rate of injection shall never exceed the rate of recovery pumping (verified by <br />weekly average flows) plus the amount of fluid needed to replace the volume of prodi-iced <br />nallcolite. <br />Infection Fluid Limitation <br />No off -site waste. on -site industrial wastes or solvents may be injected. Injection of any <br />hazardous waste as identified by EPA under 40 CFR 261.; is expressly prohibited. The approved <br />injection fluid is a combination of the following fluids having a total volume equal to the <br />quantity needed to produce brine at the rates required by production: <br />(a) fresh water pumped from the A- Groove Aquifer, used as male -up water; <br />(b) depleted solution mining production fluid from which the <br />bicarbonate /carbonate content has been mostly removed. This fluid is <br />recycled to the wells as part of the solution mining process; and <br />(c) rnalce -up water from the process pond. <br />,� ell Construction <br />'The i3H -1 well is a horizontal well that will be drilled into the lower Boies Bed and constructed <br />accordin 7 to Part II.A. WELL CONS"1RUCTION REQUIREMENTS of the Final Area Permit <br />effective December 4, 2003. <br />Demonstration of Mechanical lnte;ority <br />(1) A successful demonstration of Part 1 (Internal) Mechanical Integrity is required prior to <br />injection. and no less than every five years after the last successful test. <br />(2) The permittee shall demonstrate Part 11 (External) Mechanical Integrity pursuant to 40 CFR <br />ti 146.8(a)(2) using a temperature log and the demonstration of Part II Mechanical Integrity shall <br />be repeated no less than every five years after the last successful test. <br />Demonstration of Financial Responsibility <br />The applicant has demonstrated financial responsibility by a Letter of Credit and has been <br />approved by EPA. The Director may revise the amount required, and may require the permittee <br />to obtain and provide updated estimates of costs for plugging the well according to the approved <br />PlLtgging and AbMdonnlent plan. <br />PILI�Igina, and Abandonment <br />'lie well shall be plugged in a manner that isolates the injection zone and prevents movement of <br />illllds into or hetween USDWs. according to Part II.E. PLUGGING AND ABANDONMENT of <br />tlzc I;inal Area Permit effective December 4. 2003. <br />Ar, !�:A OF REVIF`AV (ACR) WELL REQUIREMENTS <br />T,,� -o wells. the DS -5 and 13II -R, have been identified to reside within a 1/4 mile radius from the <br />13H -1 injection well. <br />Alltf70tri_uliOI7 for.1(16hriuirul JVe/ /: UIC Area Permit C030358 -00000 <br />Well: 13H -1 EPA fi'el/ ID: C030358 -08417 Pale 3 of 5 <br />