Laserfiche WebLink
Climax Mine <br /> 1998 Reclamation Report <br /> Other Reclamation Activities/Monitoring <br /> Dust Control <br /> 218 acres of experimental dust control on the beach of Tenmile Tailing Pond using shotcrete techniques <br /> See Figure C <br /> Analytical results for PCB Sampling in the Arkansas Basin(1st,2nd,3rd,&4th Quarter Sampling) <br /> None detected <br /> Analytical results for Eagle Park Reservoir(4th quarter,in reservoir) <br /> Attached <br /> Analytical results for Eagle Park Reservoir water delivery <br /> Initiated December 14, 1998. Planned delivery through March, 1999 <br /> Data to be provided per condition No 2 August 26, 1998 Correspondence from DMG to CIVIC <br /> Eagle Park Slope Stability Monitoring <br /> October 1998 results attached <br /> 5-Shaft Seep Monitoring Area monitoring results <br /> No substantive changes over 1997 Results <br /> Monitored on July 10 and September 9, 1997 <br /> Biosolids <br /> Annual Report Attached <br /> Environmental Protection Facilities <br /> Completed surge line for 5-Dam Seep Return System to 3-Dam Mix Box <br /> Maintenance and improvement of West Gravity Line to Robinson Lake <br /> Robinson Pump Station removed as an Environmental Protection Facility <br /> Building Demolition <br /> See Attached Figure D <br /> Not included in figure are the Heavy Metals and Ion Exchange Buildings-Removed in 1998 <br />