Laserfiche WebLink
Climax Mine <br /> 1998 Reclamation Report <br /> Eagle Park Reclamation Specifics <br /> No Figure Included <br /> Reclamation (Refer to 1998 submittals and correspondence) <br /> Total Acreage Involved Approx. 1 <br /> Stage of Reclamation Acres Remarks <br /> Graded 0 <br /> Backfilled 0 <br /> Seeded 0 <br /> Fertilized 0 <br /> Shrub Planting 1 Slope Stability Monitoring Area-south shore of Eagle Park Reservoir. Ribes(400) <br /> Mulched 0 <br /> All work indicated above is ahead of the Climax Reclamation Timetable(1989 Amendment) <br />