Laserfiche WebLink
Climax Mine <br /> 1996 Reclamation Report <br /> Eagle Park Reclamation Specifics <br /> Figure C <br /> See Attached Map <br /> 1) Tailing Removal - Final Figures <br /> Total volume removed yd"3 Method <br /> 1994 51,000 Slurry pumping <br /> 1995 539,200 Truck Haul <br /> 1996 451,100 Truck Haul <br /> Total 1,041,300 <br /> 2) Topsoil Capture Below Eagle Park Tailing - 56,400 yd"3 <br /> Figures B & C show locations of topsoil stockpiling and spread <br /> Stockpiles were seeded with 50 pounds/acre Cereal Rye/Wheatgrass Hybrid (Regreen) for interim stabilization <br /> 11,200 yds"3 were applied to a 6 acre area identified on Figure B <br /> 3) Revegetation <br /> Total Acreage Involved 19.9 <br /> Stage of Reclamation Acres Remarks <br /> Graded 16.9 Does not include regrading of the interior of Eagle Park Reservoir (below high <br /> water mark) <br /> Backfilled 0 <br /> Seeded 16.9 Climax Seed Mix at 40 pounds PLS/acre <br /> 3 Erosion control mixture below high water mark <br /> Fertilized 0 <br /> Shrub Planting 2 Diffuse planting of 875 seedlings (Salix sp., Betula glandulosa,) <br /> Mulched 19.9 All seeded acres at 2 tons/acre hydro-applied <br /> Additional roadway berm removal occurred on 4000 feet of haul road <br />