Laserfiche WebLink
w <br /> Climax Mine <br /> 1996 Reclamation Report <br /> Highway Frontage Reclamation Specifics <br /> Figure B <br /> See Attached Map <br /> 1) Interim Topsoil Stockpiles developed on crest of 1-Dam, Robinson Tailing Pond, and at E-Dump. <br /> 2) 15 acres received lime application of 20 tons per acre calcium oxide/calcium carbonate. <br /> 7 acres were topsoiled to a depth of 1-foot (11,200 yds"3). <br /> 3) Biosolids receiving/staging area was prepared. Signed agreement pending. <br />