Laserfiche WebLink
2. The haul road from the mine site through the under- <br /> pass and along lfhe 'west side of the Robinson tailing <br /> pond to the No. 1 tailing dam will be constructed. <br /> In addition, a branch haul road will be constructed <br /> from the underpass along the east side of the <br /> Robinson tailing pond to the McNulty Pump Station. <br /> 3. The small disturbed areas surrounding Buffehrs Lake <br /> will be reclaimed. <br /> 4. The topsoil stockpiles near Buffehrs Lake will be <br /> seeded. <br /> 5. Maintenance activities in the Arkansas Aggregate Area <br /> will continue. <br /> 6. Dust suppression activities will continue. <br /> Attached is the annual fee of $350. 00 as required by Rule <br /> 2. 42. Site maps have not been included as there have been <br /> no changes in those maps in the past several years. New, <br /> more workable maps are being prepared for inclusion with <br /> the permit amendment. <br /> Sincerely, <br /> Panager , <br /> W Todd <br /> Environmental Assessment <br /> JWT:nc <br /> Attachment <br /> -3- <br />