Once the rockfall barrier and mesh drape were completed, the existing wood - framed <br />canopy structure would be rehabilitated. The mine portal is covered with a 25 -foot x 25- <br />foot steel and wood lagging structure with a gate. See attached photograph of the Red <br />Point Mine portal showing approximate height of the existing structure. The structure <br />remains in fair shape, but some the lagging would need to be replaced with new timbers <br />to make the entrance secure and to prevent unauthorized access. Any loose rock and <br />debris on top of the structure would be mucked and the timbers would be covered with <br />OSB plywood. All of the work described above would be performed by Rock Solid <br />Solutions, Parachute, CO and would take approximately 15 days to complete. <br />Other exterior work needed to prepare the mine for re -entry would include removing <br />loose rock and debris from the side of the road along the mine face to clear the area for <br />safe parking and equipment staging. Additionally, the existing entrance ramp into the <br />mine would need to be re- constructed to allow equipment access to the mine. The <br />entrance portal sits about 8 to 10 feet above the existing road and a ramp would have to <br />be built to allow equipment to be moved from the road into the mine. The ramp would <br />be constructed at 15% grade and would be constructed of local material. Equipment used <br />for this may include a backhoe and/or road grader. Surface grading/ramp construction <br />would take approximately 7 days to complete. <br />Proposed Interior Roof Scaling and Bolting <br />Thyssen Mining would be contracted to refurbish the underground portions of the mine <br />identified as potential areas for future research activities. This work would include <br />scaling the mine interior, replacing existing rusted or corroded rock bolts, replacing <br />matting and cyclone wire, and generally making the mine safe for re- entry. They would <br />also install a box fan at the top of the ventilation drift in the upper portion of the mine <br />along with the necessary utilities to complete this work (water, compressed air, and <br />electrical lines). <br />The proposed interior mine work would entail scaling the roof and ribs of any loose rock <br />and ground support to include repairing, replacing, and /or adding roof bolts and wire <br />netting as needed. Friction bolts and cyclone wire and/or rigid matting would be replaced <br />and/or installed as necessary up the Main Portal Entry, the 20 Central Entry, the North <br />Main Access, the South Main Access, the 30 West Entry, the ventilation drift, and in the <br />20 Gallon Per Ton (GPT) and 30 GPT rooms where future research activities are <br />expected to take place. See attached Red Point Mine Site Plan for locations. <br />At the first intersection of the main adit and the main incline, a section of roof is <br />presently supported by 12 inch square wood posts. This area would be bolted with 25- <br />foot cable bolts or swellex bolts and appropriate matting or wire. Cable bolts would be <br />grouted in place. Once the bolting is completed, the wood stulls can be removed to allow <br />easy access to the 20 gallon per ton (GPT) and 30 GPT rooms where future activities are <br />expected to take place. Cable bolts would be installed at the center of wide open areas <br />and at intersection as needed. <br />