My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (17)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.-Apend. E Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 03300.0 CAST -IN -PLACE CONCRETE <br />PART 1: GENERAL <br />1.01 RELATED SECTIONS <br />Refer to the following Sections for related work: <br />• Section 02200.0 - Earthworks <br />• Section 03220.0 - Reinforcing Steel <br />1.02 SUBMITTALS <br />amee <br />A. CONTRACTOR shall provide product data to allow evaluation by MANAGER and <br />CERTIFYING ENGINEER. <br />B. CONTRACTOR's mix design for each tentative mix for concrete shall contain the following <br />information: <br />1. Slump on which design is based. <br />2. Total gallons of water per cubic yard. <br />3. Brand, type, composition, and quantity of cement. <br />4. Specific gravity and gradation of each aggregate. <br />5. Ratio of fine to total aggregates. <br />6. Weight (surface dry) of each aggregate per cubic yard. <br />7. Brand, type, ASTM designation, active chemical ingredients, and quantity of each <br />admixture. <br />9. Time of initial set. <br />1.03 TOLERANCES <br />Concrete shall be placed to the lines and dimensions shown on the DRAWINGS. <br />1.04 QUALITY ASSURANCE <br />A. All concrete testing (both field and laboratory testing) will be the responsibility of CONTRACTOR. <br />CONTRACTOR shall be responsible for cooperating with CQA Monitor during all testing activities. <br />CONTRACTOR shall provide equipment and labor to assist CQA Monitor in sampling, if requested, <br />and shall also provide access to all areas requiring testing activities. <br />B. Any Work found unsatisfactory or any Work disturbed by subsequent operations before acceptance is <br />granted shall be corrected by CONTRACTOR. <br />Section 03300 Page 1 of 4 September 3, 2008 <br />Cast -In -Place Concrete Revision 1 <br />S. \Projects \1125E CCV CQA \I - Tech Specs \03300 r1 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.