Laserfiche WebLink
Section 02200 <br />Earthworks <br />K. Bedding Fill <br />amee <br />1. Bedding Fill shall be placed within the limits of the valley leach facility as shown on the <br />DRAWINGS. <br />2. CONTRACTOR shall place and compact the Bedding Fill in loose lifts such that the <br />compacted lift thickness is a minimum of 12- inches. CONTRACTOR shall condition the <br />Bedding Fill to allow a surface that does not cause rutting or other deleterious effects. The <br />moisture content and density shall be uniform throughout the lift. If a lift of compacted <br />Bedding Fill dries out during placement operations, CONTRACTOR shall scarify, <br />moisture condition the dry soil and recompact the lift. If a lift of compacted Bedding Fill <br />becomes overly wet due to precipitation or over watering, CONTRACTOR shall allow the <br />wet soil to dry to the specified moisture content range before recompaction of fill and <br />placement of geosynthetic materials. <br />3. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing. <br />Bedding Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to <br />facilitate CQA field testing. <br />4. CONTRACTOR shall trim the surface of the Bedding Fill to the design grades shown on <br />the DRAWINGS. <br />5. CONTRACTOR shall roll the surface of the Bedding Fill with a smooth drum roller to <br />remove ridges and surface irregularities greater than 0 5 inches in height. CERTIFYING <br />ENGINEER shall determine if surface preparation is sufficient to place geomembrane. On <br />areas with slopes steeper than 3H:1 V, CONTRACTOR shall adopt methods as necessary to <br />obtain the same final surface preparations that would be obtained by the passage of a <br />smooth -drum roller on flat or level ground. Pushing of compaction equipment by tracked <br />equipment shall not be performed. Wheel ruts on the surface of the Bedding Fill from <br />grading equipment shall be repaired by CONTRACTOR prior to placement of the <br />geomembrane by rolling the surface as approved by CQA Monitor. CONTRACTOR shall <br />take whatever steps necessary to prepare Soil Liner Fill surface to the satisfaction of <br />MANAGER and CERTIFYING ENGINEER, at no additional cost to CC &V. <br />6. CONTRACTOR shall maintain the Bedding Fill surface in a condition suitable for <br />geomembrane installation as specified in these SPECIFICATIONS and in the CQA Plan <br />until the surface is covered. CONTRACTOR shall repair all weather related damage to <br />Bedding Fill surfaces or other portions of the Work that have or have not been covered by <br />geomembrane, at no additional cost to CC &V. <br />If any moisture is allowed to collect under the geomembrane prior to or after final seaming <br />and softens the Bedding Fill, the geomembrane shall be removed and CONTRACTOR <br />shall recondition and recompact the Soil Liner Fill to meet all placement and trimming <br />SPECIFICATIONS, at no additional cost to CC &V. <br />7. CONTRACTOR shall remove all hubs and survey stakes in the Bedding Fill and backfill <br />all holes with MANAGER and CERTIFYING ENGINEER approved material. <br />8. CONTRACTOR shall verify the final thickness of Bedding Fill to determine compliance <br />with this SPECIFICATION. CONTRACTOR shall record as part of the as -built <br />documentation the location, elevation, and thickness of each Bedding Fill verification test. <br />CQA Monitor will witness all verification measurements. Areas with deficiencies shall be <br />P \Phase 5 OSA 2011 Cell Report\Appendices\Appendix E Specifications \02200.r1 doc <br />Page 17 of 18 September 3, 2008 <br />Revision 1 <br />