Laserfiche WebLink
Section 02200 <br />Earthworks <br />7. CONTRACTOR shall place Drain Cover Fill at a rate such that the geomembrane liner is <br />not exposed to ultraviolet light for more than 180 days. <br />8. CONTRACTOR shall provide close continuous monitoring at the point of placement <br />during the placement of the Drain Cover Fill over geosynthetics. <br />9. CONTRACTOR shall verify the final thickness of Drain Cover Fill to determine <br />compliance with this SPECIFICATION. CONTRACTOR shall record verification <br />location, elevation, and thickness. CQA Monitor shall witness all verification <br />measurements. CONTRACTOR will submit a method of verifying Drain Cover Fill depth <br />to MANAGER for approval. Grade markers shall be placed on a 50 -by -50 -foot grid with <br />additional points required for breaks in grade. CONTRACTOR shall remove all grade <br />markers under supervision of CQA Monitor after verification measurements have been <br />approved by MANAGER and CERTIFYING ENGINEER and will backfill holes with <br />Drain Cover Fill. Areas with deficient thickness shall be reworked by CONTRACTOR, <br />until acceptable measurements are obtained. If MANAGER or CERTIFYING <br />ENGINEER suspects the occurrence of any damage to the underlying geosynthetics, <br />MANAGER will instruct CONTRACTOR to remove Drain Cover Fill to expose the <br />geosynthetics. CONTRACTOR shall uncover, repair any observed damage of the <br />underlying geosynthetics, in accordance with the repair requirements of Sections 02776.0 <br />and 02777.0 of these SPECIFICATIONS and recover, at no cost to CC &V. <br />10. CONTRACTOR will provide adequate illumination as approved by MANAGER, if Drain <br />Cover Fill placement is carried out at night. A minimum of 2 -foot candles measured at the <br />synthetic liner shall be used when Drain Cover Fill placement is carried out at night. <br />I. Pipe Bedding Material <br />1. Pipe Bedding material shall be placed around the CSP as shown on the drawings. <br />ame0 <br />requirements of Sections 02776.0 and 02777.0 of these SPECIFICATIONS, and recover, at <br />no cost to CC &V. <br />2. For piping external to the valley leach facility, CONTRACTOR shall compact the Pipe <br />Bedding Material requiring compaction to at Least 95 percent of the maximum dry density as <br />determined by the Standard Proctor density test (ASTM D698), and a moisture content <br />3 percent below and 3 percent over the optimum moisture content. <br />3. CONTRACTOR shall place Pipe Bedding Material in maximum 12 -inch loose lifts. Pipe <br />Bedding Material will be worked under pipe haunches by hand to provide uniform support <br />of the CSP. <br />4. Native material used for backfilling CSP excavation shall be placed in 12 -inch to 18 -inch <br />loose lifts, and compacted by wheel rolling with light, rubber tired or other light compaction <br />equipment, as approved by CERTIFYING ENGINEER. <br />J. Granular Filter Material <br />1. Granular Filter Material shall be placed beneath the Riprap as shown on the drawings. <br />P \Phase 5 OSA 2011 Cert Report\Appendices\Appendix E Specifications \02200 r1 doc <br />Page 16 of 18 September 3, 2008 <br />Revision 1 <br />