My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (17)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.-Apend. E Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 02200 <br />Earthworks <br />ameel <br />areas with slopes steeper than 3H:1 V, CONTRACTOR shall adopt methods as necessary to <br />obtain the same final surface preparations that would be obtained by the passage of a <br />smooth -drum roller on flat or level ground. Pushing of compaction equipment by tracked <br />equipment shall not be performed. Wheel ruts on the surface of the Soil Liner Fill from <br />grading equipment shall be repaired by CONTRACTOR prior to placement of the <br />geomembrane by rolling the surface as approved by CQA Monitor. <br />12. CONTRACTOR will remove angular protruding rocks greater than 3/4 inches in diameter <br />from the compacted Soil Liner Fill surface. Indentations left in the Soil Liner Fill Surface <br />after removal of the rocks shall be filled with Soil Liner Fill or other suitable fill approved <br />by CQA Monitor, and compacted to achieve final grade. Areas of the Soil Liner Fill surface <br />with concentrated gravelly areas will have suitable fill approved by CQA Monitor placed on <br />top and compacted to achieve final grade. A maximum thickness of 0.5 inches of suitable <br />fill will be placed on the Soil Liner Fill. <br />13. MANAGER and CERTIFYING ENGINEER will identify any areas of significant <br />desiccation, crusting, or erosion of a lift surface. Soil Liner Fill surfaces found to have <br />desiccation cracks greater than 0.25- inches in width or depth, or which exhibit swelling, <br />heaving or other similar conditions shall be replaced or reworked by CONTRACTOR to <br />remove such defects. Desiccation cracks on the Soil Liner Fill surface less than 0 25- inches <br />in width or depth shall be compacted with a smooth drum roller. CONTRACTOR shall <br />take whatever steps necessary to prepare Soil Liner Fill surface to the satisfaction of <br />MANAGER and CERTIFYING ENGINEER, at no additional cost to CC &V. <br />14. CONTRACTOR shall maintain the Soil Liner Fill surface in a condition suitable for <br />geomembrane installation as specified in these SPECIFICATIONS and in the CQA Plan <br />until the surface is covered. CONTRACTOR shall repair all weather related damage to <br />Soil Liner Fill surfaces or other portions of the Work that have or have not been covered by <br />geomembrane, at no additional cost to CC &V. <br />If any moisture is allowed to collect under the geomembrane prior to or after final seaming <br />and softens the Soil Liner Fill, the geomembrane shall be removed and CONTRACTOR <br />shall recondition and recompact the Soil Liner Fill to meet all placement and trimming <br />SPECIFICATIONS, at no additional cost to CC &V. <br />15. CONTRACTOR shall remove all hubs and survey stakes in the Soil Liner Fill and backfill <br />all holes with MANAGER and CERTIFYING ENGINEER approved moisture - <br />conditioned Soil Liner Fill or bentonite. Compact with a Proctor hammer or other suitable <br />device that will achieve a kneading type of compaction and will achieve the required density. <br />16. CONTRACTOR shall verify the final thickness of Soil Liner Fill to determine compliance <br />with this SPECIFICATION. Thickness verification shall be performed at a minimum <br />frequency of two measurements per acre using a soil -coring device, unless directed <br />otherwise by MANAGER. CONTRACTOR shall record as part of the as -built <br />documentation the location, elevation, and thickness of each Soil Liner Fill verification test. <br />CQA Monitor will witness all verification measurements. CONTRACTOR shall backfill <br />all holes with MANAGER and CERTIFYING ENGINEER approved moisture - <br />conditioned Soil Liner Fill compacted with a Proctor hammer or other suitable device that <br />will achieve a kneading type of compaction and will achieve the required density, or <br />bentonite. Areas with deficiencies shall be reworked by CONTRACTOR, until acceptable <br />measurements are obtained at no additional cost to CC &V. <br />P \Phase 5 OSA 2011 Cert Report \Appendices\Appendix E Specifications \02200 r1 doc <br />Page 14 of 18 September 3, 2008 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.