My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (17)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.-Apend. E Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 02200 <br />Earthworks <br />amee <br />2. CONTRACTOR shall process, place and compact the Soil Liner Fill to achieve a <br />coefficient of permeability of less than 1x10 cm/sec, measured according to ASTM <br />Method D5084, Method D. Any Soil Liner Fill not meeting the permeability specification <br />shall be removed and replaced with material meeting the permeability specification, at no <br />additional cost to CC &V. <br />3. CONTRACTOR shall place and compact the Soil Liner Fill in loose lifts such that the <br />compacted lift thickness is a minimum of 12- inches. <br />4. CONTRACTOR shall compact the Soil Liner Fill to at least 95 percent of the maximum <br />dry density as determined by the Standard Proctor density test (ASTM D698). The moisture <br />content shall be within +3% to -2% of the optimum moisture content. Both moisture and <br />density shall be uniform throughout the lift. If the Soil Liner Fill cannot be conditioned to <br />meet the placement specifications, the material shall be removed and replaced with new Soil <br />Liner Fill at the CONTRACTOR's expense. The CONTRACTOR shall reduce the clod <br />size of the soil liner fill to a size that is acceptable to the CERTIFYING ENGINEER, the <br />method by which will be approved by CERTIFYING ENGINEER and MANAGER prior <br />to implementation. <br />5. The moisture content of the Soil Liner Fill shall be uniform throughout prior to and during <br />compaction of the material. CONTRACTOR shall be responsible for meeting moisture <br />content and compaction SPECIFICATIONS. If the Soil Liner Fill cannot be conditioned to <br />meet the placement SPECIFICATIONS, the material shall be removed and replaced with <br />new Soil Liner Fill at no additional cost to CC &V. MANAGER may require <br />CONTRACTOR to moisture condition Soil Liner Fill at stockpile at least 24 hours prior to <br />the Soil Liner Fill being placed. <br />6. CONTRACTOR shall place Soil Liner Fill to form a continuous monolithic material. If a <br />lift of compacted Soil Liner Fill dries out during placement operations, CONTRACTOR <br />shall scarify, moisture condition the dry soil and recompact the lift. If a lift of compacted <br />Soil Liner Fill becomes overly wet due to precipitation or over watering, CONTRACTOR <br />shall allow the wet soil to dry to the specified moisture content range before recompaction of <br />fill and placement of geosynthetic materials. <br />7. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing. Soil <br />Liner Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to facilitate <br />CQA field testing. <br />8. CONTRACTOR shall maintain Soil Liner Fill stockpile areas in a free - draining condition. <br />The CONTRACTOR will maintain Soil Liner Fill stockpiles and Soil Liner Fill placed <br />within the limits of the valley leach facility to prevent the drying out of the surface. <br />9. CONTRACTOR shall compact comers and other areas inaccessible to driven compaction <br />equipment using hand - operated 500 -pound vibratory plate or vibratory smooth -drum <br />compaction equipment approved by MANAGER and CERTIFYING ENGINEER. <br />10. CONTRACTOR shall trim the surface of the Soil Liner Fill to the design grades shown on <br />the DRAWINGS. <br />11. CONTRACTOR shall roll the surface of the Soil Liner Fill with a smooth drum roller to <br />remove ridges and surface irregularities greater than 0.5 inches in height. CERTIFYING <br />ENGINEER shall determine if surface preparation is sufficient to place geomembrane. On <br />P \Phase 5 OSA 2011 Cert Report \AppendiceskAppendix E Specifications \02200 r1 doc <br />Page 13 of 18 September 3, 2008 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.