Laserfiche WebLink
Section 02200 <br />Earthworks <br />A. Stripping of the topsoil shall be done within the entire area of the stripping limits. <br />amec <br />B. CONTRACTOR shall excavate and remove topsoil in a manner that will minimize contamination <br />with other soil horizons, and will take such measures as are necessary to ensure that the removal of <br />topsoil does not result in erosion or excessive sedimentation. <br />C. CONTRACTOR shall stockpile topsoil at locations designated by MANAGER. Stored topsoil <br />shall not be disturbed by mining, leaching operations, or construction activities, and shall be protected <br />from wind and water erosion, compaction, and contamination. <br />D. CONTRACTOR shall grade topsoil stockpiles to prevent erosion and ponding of precipitation in the <br />stockpile areas. The maximum topsoil stockpile height will be approved by MANAGER. The <br />CONTRACTOR shall protect stockpiled topsoil by an effective cover of non - noxious, quick - <br />growing, annual, and perennial plants, approved by MANAGER, which shall be seeded or planted <br />during the first appropriate growing season after removal. <br />3.03 WASTE REMOVAL: <br />Waste material is defined as material too wet, too dry, frozen or containing ice or snow, containing organic or <br />other deleterious matter, having poor characteristics of grading or compaction, having other characteristics that <br />may result in undesirable settlement or other movement of the fill, or within the fill, or otherwise not meeting <br />the requirements of the SPECIFICATIONS, provided that this definition permits drying, water, and any other <br />processing or reprocessing to make the material stable and suitable prior to incorporating it into the fill as <br />permitted in the SPECIFICATIONS or by the MANAGER and CERTIFYING ENGINEER. <br />A. CONTRACTOR shall excavate and remove waste in a manner that will minimize contamination <br />with other soil horizons. <br />B. CONTRACTOR shall stockpile removed waste at locations designated by MANAGER. <br />3.04 EXCAVATION: <br />A. CONTRACTOR shall perform excavation to the lines and grades shown on the DRAWINGS or as <br />directed by MANAGER. No excavation shall begin until the CONTRACTOR has provided <br />construction staking for the proposed work. <br />B. CONTRACTOR shall prevent the disturbance of surrounding areas during excavation. Where <br />selective excavations are required to obtain materials for Structural Fill and Select Structural Fill, the <br />material removed from the excavations shall be taken directly to the fill areas or, if required, <br />stockpiled by material types. The stockpiles shall be approved by MANAGER. <br />C. CONTRACTOR shall grade all excavations to ensure grades are maintained to provide adequate <br />drainage at all times. Work shall be suspended by CONTRACTOR when, in the opinion of <br />MANAGER and CERTIFYING ENGINEER, the site is overly wet, muddy, or otherwise <br />unsuitable for proper maintenance, until directed otherwise by MANAGER, at no cost to CC &V. <br />D. In excavations where Structural Fill or Select Structural Fill is to be placed on slopes steeper than <br />3H:1 V, horizontal benches shall be excavated into the slope to allow fill to be placed in horizontal <br />lifts. The CONTRACTOR shall continuously bench and key embankment material into the existing <br />material a minimum of 2 feet. <br />P \Phase 5 OSA 2011 Cert Repor\Appendices\Appendix E Specifications \02200.r1 doc <br />Page 6 of 18 September 3, 2008 <br />Revision 1 <br />