My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (17)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.-Apend. E Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />2 -inch <br />100 <br />No. 4 <br />30 <br />— 100 <br />No. 200 <br />5 <br />— 20 <br />U.S. Standard <br />Sieve Size <br />Percent Passing <br />by Dry Weight <br />3 -inch <br />100 <br />2 -inch <br />75 <br />— 100 <br />No. 200 <br />0 <br />— 15 <br />PART 3: EXECUTION <br />3.02 TOPSOIL REMOVAL: <br />11. Pipe Bedding Material - material as approved by MANAGER and CERTIFYING <br />ENGINEER conforming to the following SPECIFICATIONS: <br />Plasticity Index: <br />12. Granular Filter Material - material as approved by MANAGER and CERTIFYING <br />ENGINEER conforming to the following SPECIFICATIONS: <br />3.01 CLEARING AND GRUBBING: <br />Plasticity Index: <br />A. Clearing and grubbing shall be done within the footprint of the limits of the construction area, as <br />delineated on the DRAWINGS. Clearing shall extend a maximum of 15 feet and a minimum of 10 <br />feet outside of the construction limits or as directed by MANAGER. Areas for clearing shall be <br />released to CONTRACTOR by MANAGER. No pioneering of roads across undisturbed areas shall <br />be allowed without prior approval of MANAGER. <br />B. No clearing shall be performed until written permission is given by MANAGER and until the <br />CONTRACTOR has provided construction staking for the proposed work. Clearing shall consist of <br />cutting brush to the ground level, removing such material, along with wood, rubbish, tree stumps, and <br />any other vegetation with roots in excess of 1 -inch diameter, and other deleterious materials, and <br />disposing of all such material in the accepted manner described below. <br />C. In areas designated to be stripped of unsuitable or objectionable material, said materials shall be <br />stripped to the full depth of organic or other unsuitable material as determined by MANAGER and <br />CERTIFYING ENGINEER, whichever is greater. <br />D. Stripped and grubbed vegetation shall be removed and disposed in stockpiles or other approved <br />methods in an area designated by MANAGER. <br />Topsoil is defined as an acceptable growth medium as approved by MANAGER and CERTIFYING <br />ENGINEER that has no chemical or physical characteristics, which will exclude its use as such. <br />Section 02200 Page 5 of 18 September 3, 2008 <br />Earthworks Revision 1 <br />P \Phase 5 OSA 2011 Cert Report'Appendices\Appendix E Specifications \02200 r1 doc <br />5 maximum <br />5 maximum <br />amec3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.