My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (16)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.- Cover to Append E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />1.3 Project Coordination <br />AMEC CQC and CQA activities were directed by the AMEC Project Resident. The AMEC <br />Project Resident (CQA Supervisor) for the construction of the Phase 5 Berm Modification for <br />the period June 2012 to August 2012 was Mr. Joseph D. Hickey. The Certifying Engineer <br />and Project Manager, Mr. Jay Janney- Moore, P.E, made periodic site visits to resolve <br />technical issues and to review AMEC activities. Appendix C presents a summary of the <br />AMEC staff on -site during the period of June 2012 through August 2012. <br />Representatives of CC &V, Ames, Lone Star, and AMEC conducted daily, weekly, and <br />preconstruction coordination meetings throughout the construction period. <br />1.3.1 Daily Construction Summary Reports <br />AMEC prepared daily construction summary reports as well as photographic documentation <br />(Appendix B) throughout the project to document the key elements of construction and the <br />CQA activities that occurred. On -site AMEC CQA personnel, the Certifying Engineer <br />discussed construction activities on a regular basis. In addition, field personnel prepared <br />daily observation reports. AMEC submitted these daily summary reports to CC &V. Daily <br />reports are not included in this report, but were available for Colorado Division of <br />Reclamation Mining & Safety (DRMS) review during the course of the project. <br />1.3.2 Weekly Construction Summary Reports <br />AMEC prepared weekly construction summary reports which were submitted to CC &V. <br />Weekly reports from the period of June 2012 through August 2012 are presented in <br />Appendix D. <br />1.4 Project Specifications <br />All work was performed in accordance with the design plans and specifications for the <br />Phase 5 Berm Modification, which were prepared in accordance with the requirements <br />AMEC Environment & Infrastructure, Inc. <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec.com 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.