My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (16)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.- Cover to Append E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />F) Drain Cover Fill (DCF) <br />No work performed during the week. <br />II) Geosynthetics <br />A) Geomembrane Installation <br />No work performed during the week. <br />B) Geomembrane Exposure <br />Existing Phase 5 geomembrane was exposed using a John Deere 35D excavator and laborers, <br />preparing for berm raise construction and berm raise geomembrane tie -in. An AMEC field <br />representative observed geomembrane exposure. <br />C) Anchor Trench <br />No work performed during the week. <br />D) Geomembrane Acceptance <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed subgrade preparation for the Phase 5 Berm Raise project prior to select structural fill <br />placement. <br />AMEC observed excavation and placement of select structural fill for the Phase 5 Berm Raise project. <br />AMEC observed slope contouring for the Phase 5 Berm Raise project. <br />AMEC observed site grading for the Phase 5 Berm Raise project. <br />AMEC observed exposure of existing geomembrane for the Phase 5 Berm Raise project. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Install drainage basin <br />Expose existing Phase 5 VLF geomembrane for the Phase 5 Berm Raise geomembrane tie -in. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />PSBR.Weekly Report WE 06.16.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.