My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (16)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.- Cover to Append E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />6.0 GEOMEMBRANE CQA TESTING AND MONITORING <br />The following sections describe the CQA activities performed by AMEC for the <br />geomembrane installed in the Phase 5 Berm Modification. <br />In accordance with the AMEC Geosynthetics CQA Plan (Section 1400.2 of the <br />Specifications), when an AMEC monitor observed deficiencies, the monitor determined the <br />nature and extent of the problem and notified Lone Star and /or CC &V. When unsatisfactory <br />test results identified a deficiency, AMEC performed additional tests to define the extent of <br />the deficient area. Lone Star corrected deficiencies to meet the requirements of the <br />specifications, and AMEC retested and /or approved the corrected deficiency prior to any <br />additional related work. <br />CQA activities conducted by AMEC during the installation of the LLDPE geomembrane in <br />the Phase 5 Berm Modification consisted of the following: <br />• Conformance sampling and testing of the geomembrane; <br />• Observation and approval of the SLF surface prior to deployment of 80- <br />mil double -sided textured LLDPE geomembrane; <br />• Observation and documentation of geomembrane deployment, including <br />verifying sheet thickness and overlap, and documenting panel layout; <br />• Observation of trial seam sample testing and documentation of results; <br />• Observation and documentation of field seaming; <br />• Identification of destructive seam sample test locations, observation of <br />destructive seam sample testing, and documentation of test results; <br />• Observation and documentation of geomembrane repairs; and <br />• Observation and documentation of non - destructive pressure testing of <br />fusion seams and vacuum testing of extrusion seams and repairs. <br />The following sections present a detailed description of each of the above activities. <br />AMEC Environment & Infrastructure, Inc. <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec.com <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.