My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (16)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.- Cover to Append E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />4.2.2 Site Grading <br />AMEC monitored site grading. The SSF contained more than 30 percent by weight larger <br />than 3/4 -inch particle size, and was placed by method specification (per Specification 2200 <br />Section 3.06). <br />AMEC verified that the SSF maximum particle size of the fill did not exceed 3 inches, and <br />that lifts were no thicker than one foot (compacted). AMEC verified that Ames made a <br />minimum of four passes with the SDVR compactor. <br />4.2.3 Soil Liner Fill <br />Field testing included monitoring of placement and preparation of SLF for geomembrane <br />deployment, testing in -place moisture and density with a nuclear gauge, and monitoring <br />depth verification to project specifications. <br />4.2.3.1 Field Monitoring <br />AMEC observed SLF placement to verify lift thickness, adequate compaction, acceptable <br />moisture conditions, final compacted thickness, and suitability for geomembrane <br />deployment. AMEC identified angular particles on the fill surface, ruts, and desiccation <br />cracks, and brought these features to the attention of Ames for repair. Ames completed <br />repairs by placing fines from their SLF processing plant or from temporary piles of fine SLF <br />to smooth and re- compact the fill surface in areas that were observed to be rough or <br />inadequate, as discussed in Section 2.5. AMEC and Lone Star approved the final surface of <br />the SLF within the Phase 5 Berm Modification prior to geomembrane deployment. <br />4.2.3.2 Moisture - Density Test Results <br />AMEC performed a total of four (4) in -place moisture - density tests of SLF. AMEC compared <br />results of the field moisture content and density tests to the maximum standard Proctor dry <br />density and optimum moisture content values of material with similar gradation and plasticity <br />AMEC Environment & Infrastructure, Inc. <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec.com <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.