Laserfiche WebLink
ameO <br />2.0 SUMMARY OF EARTHWORK CONSTRUCTION <br />Earthworks activities associated with the Phase 5 Berm Modification included the following: <br />• Site grading, including cut/fill; <br />• Subgrade preparation; <br />• SLF installation, placement and compaction, depth verification testing, <br />and preparation of SLF surface for geomembrane deployment; <br />• Primary geomembrane liner system installation; <br />Ames generally used the following equipment during construction: <br />• Caterpillar D6 Low Ground Pressure (LGP) Dozer; <br />• Bobcat Skidsteer; <br />• Caterpillar 950 Loader; <br />• Caterpillar 988 Loader; <br />• Caterpillar CS663 Compactor; <br />• John Deere 35D Excavator; <br />• John Deere 120 Excavator; <br />• Doosan 225 Excavator; <br />• Caterpiller 304 Excavator; <br />• Caterpillar 312 Excavator; <br />• Caterpillar 330 Excavator; <br />• Caterpillar 345 Excavator; <br />• Caterpillar 375 Excavator; <br />• Caterpillar 740 Haul Truck; and <br />• Water Trucks. <br />AMEC Environment & Infrastructure, Inc. <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec.com <br />C^' <br />