Laserfiche WebLink
THE MINE OPERA TOR HAS DEMONSTRATED THAT OFF -SITE IMP ACTS DUE TO <br />BLASTING ARE CONTROLLED WITHIN ACCEPT ABLE LIMITS AND HAVE MET ALL <br />TECHNICAL REQUIREMENTS OF THE DIVISION OF MINERALS AND GEOLOGY BYWAY <br />OF TECHNICAL REVISION NUMBER 003 AS APPROVED IN 1996. <br />OTHER ISSUES <br />AT THE PRESENT TIME, TEZAK HEAVY EQUIPMENT CO., INC., IS IN NEGOTIATION <br />WITH THE CITY OF CANON CITY TO DEVELOP A PRIVATE ACCESS INTO AND OUT <br />OF MINE PROPERTY ACROSS CITY PROPERTY DIRECTLY NORTH OF TUNNEL <br />DRIVE, THE EXISTING ACCESS ROUTE TO THE MINE SITE. THIS ROADWAY <br />EASEMENT WILL BE LOCATED WHOLLY ON CITY PROPERTY WITH THE EXPRESS <br />GOAL OF ALLOWING ACCESS TO THE MINE PROPERTY WHILE MINIMIZING <br />TRAFFIC RELATED IMPACTS TO THE RESIDENTIAL AREA ALONG TUNNEL DRIVE. <br />A RIGHT -OF -WAY LOCATION AND ENGINEERED ROAD CONSTRUCTION DESIGN HAS <br />BEEN PRESENTED TO THE CITY OF CANON CITY FOR REVIEW AND APPROVAL. <br />DETAILED ENGINEERED DRAWINGS OF THE PROPOSED EASEMENT AS SUBMITTED <br />TO THE CITY OF CANON CITY ARE INCLUDED IN THIS APPLICATION AS NOTED AND <br />FIVE ACRES OF AFFECTED LAND HAVE BEEN ADDED TO THE TOTAL TO REFLECT <br />THAT ACREAGE NECESSARY TO INCLUDE THE ROAD EASEMENT WITH THIS PERMIT <br />AMENDMENT APPLICATION. A FINALIZED AND SIGNED EASEMENT AGREEMENT <br />WILL BE INCLUDED WITH THIS AMENDMENT PACKAGE AS SOON AS IT IS <br />AVAILABLE. <br />