Rule 6.5 Geotechnical Stability Exhibit (any required sections) <br />(1) On a site - specific basis, Applicant shall be required to provide a geotechnical evaluation of all <br />geologic hazards that have the potential to affect any proposed impoundment, slope, <br />embankment, highwall, or waste pile within the affected area. The Applicant may also be required <br />to provide a geotechnical evaluation of all geologic hazards, within or in the vicinity of the affected <br />lands that may be de- stabilized or exacerbated by mining or reclamation activities. <br />ALL FINAL HIGHW ALL CONFIGURATION PLANS HAVE BEEN DESIGNED IN <br />ACCORDANCE WITH SITE SPECIFIC ROCK STABILITY CHARACTERISTICS AS <br />PORTRAYED BY EXISTING MINJNG FACES, CURRENT MINING PRACTICES AND <br />EXPERIENCE. THE FINAL HIGHWALL CONFIGURATION PLAN HAS BEEN REVIEWED <br />BY A PROFESSIONAL GEOLOGIST AND FOUND TO BE COMPATIBLE AND <br />APPROPRIATE FOR THE ROCK CONDITIONS FOUND AT THIS LOCATION. <br />(2) On a site - specific basis, Applicant shall be required to provide engineering stability analyses for <br />proposed final reclaimed slopes, highwalls, waste piles and embankments. Applicant may also be <br />required to provide engineering stability analyses for certain slopes configuration as they will <br />occur during operations, including, but not limited to embankments. Information for slope stability <br />analyses may include, but would not be limited to, slope angles and configurations, compaction <br />and density, physical characteristics of earthen materials, pore pressure information, slope <br />height, post - placement use of site, and information on structures or facilities that could be <br />adversely affected by slope failure. <br />THE DESIGN AND CONSTRUCTION OF ALL SEDIMENT PONDS, WATER CONTAINMENT <br />STRUCTURES, BERMS, DITCHES, INLETS, AND SPILLWAYS HA VB BEEN REVIEWED <br />AND APPROVED BY A LICENSED PROFESSIONAL ENGINEER. AT THE COMPLETION OF <br />CONSTRUCTION, ALL STRUCTURES WILL BE INSPECTED AND CERTIFIED <br />OPERATIONAL BY AN ENGINEER LICENSED IN THE STATE OF COLORADO. <br />(3) <br />Where there is the potential for off -site impacts due to failure of any geologic structure or <br />constructed earthen facility, which may be caused by mining or reclamation activities, the <br />Applicant shall demonstrate through appropriate geotechnical and stability analyses that off -site <br />areas will be protected with appropriate factors of safety incorporated into the analysis. The <br />minimum acceptable safety factors will be subject to approval by the Office, on a case -by -case <br />basis, depending upon the degree of certainty of soil or rock strength determinations utilized in <br />the stability analysis, depending upon the consequences associated with a potential failure, and <br />depending upon the potential for seismic activity at each site. <br />THE DESIGN OF THE STORMWATERMANAGEMENTPLAN IS SUCH THAT SEDIMENT <br />PONDS ARE LOCATED IN A REDUNDANT AND CHAIN-LIKE ARRANGEMENT AND <br />LOCATION SO AS TO MINIMIZE OFF- Sl'1'E IMP ACTS TO PROPERTY IN THE EVENT OF A <br />FAILURE OF ANY STRUCTURE WITHIN THE STORMWA I'ER MANAGEMENT SCENARIO. <br />THE MINE OPERATOR HAS PROPOSED THIS PT .AN AS THE BEST MANAGEMENT <br />PRACTICE AVAILABLE TO ADDRESS CONTROL OF OFF-SUE IMPACTS DUE TO STORM <br />RELATED EVENTS. <br />(4) At sites where blasting is part of the proposed mining or reclamation plan, the Applicant shall <br />demonstrate through appropriate blasting, vibration, geotechnical, and structural engineering <br />analyses, that off-site areas will not be adversely affected by blasting. <br />