My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (13)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 2:35:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Append. E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02777.0 GEOTEXTILE <br />PART 1: GENERAL <br />1.01 SUMMARY <br />1.02 SUBMITTALS <br />Section 02777 <br />Geotextile <br />This SPECIFICATION describes requirements for the manufacture, supply, and installation of the geotextile <br />in the Storm Water Drain System, as shown on the DRAWINGS; and construction quality control monitoring. <br />All procedures, operations, and methods shall be in strict compliance with the SPECIFICATIONS, the <br />Construction Quality Assurance Plan, and the DRAWINGS. <br />A. Submittals with Bid Documents <br />CONTRACTOR shall provide the following information relating to the geotextile <br />MANUFACTURER with its proposal. <br />1. Information from MANUFACTURER including company name, address, telephone <br />number, the names of the company president and quality control manager, and narrative of <br />the company history. <br />2. Description of MANUFACTURER's manufacturing capabilities: <br />ame0 <br />a. Information on plant size, equipment, personnel, number of shifts per day, and <br />capacity per shift. <br />b. A list of standard material properties and test methods employed to arrive at the <br />values for each. As a minimum, the list shall include properties given in Part 2 of <br />this Section. <br />3. The Quality Control Manual followed during the manufacturing process including those for <br />the polymer material and for detecting foreign objects in the finished goods, and a <br />description of the quality control laboratory facilities, including the name and telephone <br />number of the quality control manager. Upon review of the Quality Control Manual, the <br />MANAGER and CERTIFYING ENGINEER may request additional testing during the <br />manufacturing process at no additional cost to CC &V. <br />B. CONTRACTOR shall provide the following information after contract award but within ten (10) <br />days prior to material arrival on -site and prior to commencement of the work: <br />1. The geotextile MANUFACTURER shall provide written certification that the geotextile to <br />be used meets the requirements of the Process Solution Enhancement System project and <br />has been continuously inspected for the presence of needles and geotextile was found to be <br />needle free. <br />2. A copy of the MANUFACTURER's geotextile QC test results of properties outlined in <br />Part 2 of this Section. The MANAGER reserves the right to refuse use of any geotextile <br />supplied without the proper QC documentation. <br />Page 1 of 5 <br />June 19, 2012 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.