Laserfiche WebLink
Section 02776 <br />Geomembrane <br />ENGINEER may request additional testing in order to support such acceptance. All such <br />testing shall be done at the sole expense of the CONTRACTOR. <br />2. The geomembrane rolls shall have the following properties: <br />Page 8 of 22 <br />ame9 <br />June 19, 2012 <br />Revision 1 <br />