Laserfiche WebLink
amec <br />C. Piping shall be placed to the lines and elevations shown on the DRAWINGS, with no sags or humps, <br />as approved by MANAGER and CERTIFYING ENGINEER. <br />3.02 PIPE CONNECTIONS <br />A. All connections for non - perforated pipe shall be watertight under maximum anticipated pressure <br />head. <br />B. HDPE pipe will be butt - heat - fusion welded in accordance with the MANUFACTURER's guidelines. <br />C. CPe pipe joints shall conform to MANUFACTURER's recommendations. <br />3.03 BEDDING AND BACKFILL <br />A. Bedding and backfill shall be performed as defined in Section 02220.3.06.F. <br />* ** END OF SECTION * ** <br />Section 02710 <br />Piping <br />Page 2 of 2 <br />June 19, 2012 <br />Revision 1 <br />