My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (13)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 2:35:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Append. E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02710.0 PIPING <br />PART 1: GENERAL <br />1.01 RELATED SECTIONS <br />Refer to the following Sections for related work: <br />1.02 SUBMITTALS <br />Section 02710 <br />Piping <br />Section 02200.0 - Earthworks <br />Section 02776.0 - Geomembrane <br />Section 02777.0 - Geotextile <br />A. CONTRACTOR shall abide by all qualification and submittal requirements. <br />B. CONTRACTOR shall provide product data including MANUFACTURER's technical data (resin), <br />test data (strength), and SPECIFICATIONS sufficient to allow evaluation by MANAGER and <br />CERTIFYING ENGINEER. <br />1.03 QUALITY ASSURANCE <br />amec <br />A. All work shall be constructed, monitored, and tested in accordance with the requirements of the CQA <br />Plan. <br />B. Any work found unsatisfactory or any work disturbed by subsequent operations before acceptance is <br />granted shall be corrected by CONTRACTOR as directed by MANAGER at no additional cost to <br />CC &V. <br />PART 2: PRODUCTS <br />2.01 MATERIALS <br />A. High Volume Solution Collection Pipe: <br />1. 36 -inch diameter "N -12" perforated CPe pipe, as manufactured by Advanced Drainage <br />Systems, Inc., or an equivalent approved by MANAGER, DESIGN ENGINEER and <br />CERTIFYING ENGINEER. <br />PART 3: EXECUTION <br />3.01 INSTALLATION <br />A. CONTRACTOR shall install pipe according to MANUFACTURER's recommendations. <br />B. CONTRACTOR shall take all precautions necessary to not damage the pipe during material <br />placement. CONTRACTOR may periodically be requested by MANAGER to verify that covered <br />pipe has not been crushed. Costs associated with proving pipes have not been crushed shall be borne <br />by CONTRACTOR. <br />Page 1 of 2 <br />June 19, 2012 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.