Section 02200 <br />Earthworks <br />ame0 <br />moisture content and density shall be uniform throughout the lift. If a lift of compacted <br />Bedding Fill dries out during placement operations, CONTRACTOR shall scarify, <br />moisture condition the dry soil and recompact the lift. If a lift of compacted Bedding Fill <br />becomes overly wet due to precipitation or over watering, CONTRACTOR shall allow the <br />wet soil to dry to the specified moisture content range before recompaction of fill and <br />placement of geosynthetic materials. <br />3. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing. <br />Bedding Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to <br />facilitate CQA field testing. <br />4. CONTRACTOR shall trim the surface of the Bedding Fill to the design grades shown on <br />the DRAWINGS. <br />5. CONTRACTOR shall roll the surface of the Bedding Fill with a smooth drum roller to <br />remove ridges and surface irregularities greater than 0.5 inches in height. CERTIFYING <br />ENGINEER shall determine if surface preparation is sufficient to place geomembrane. On <br />areas with slopes steeper than 3H:1 V, CONTRACTOR shall adopt methods as necessary <br />to obtain the same final surface preparations that would be obtained by the passage of a <br />smooth -drum roller on flat or level ground. Pushing of compaction equipment by tracked <br />equipment shall not be performed. Wheel ruts on the surface of the Bedding Fill from <br />grading equipment shall be repaired by CONTRACTOR prior to placement of the <br />geomembrane by rolling the surface as approved by CQA Monitor. CONTRACTOR shall <br />take whatever steps necessary to prepare BeddingFill surface to the satisfaction of <br />MANAGER and CERTIFYING ENGINEER, at no additional cost to CC &V. <br />6. CONTRACTOR shall maintain the Bedding Fill surface in a condition suitable for <br />geomembrane installation as specified in these SPECIFICATIONS and in the CQA Plan <br />until the surface is covered. CONTRACTOR shall repair all weather related damage to <br />Bedding Fill surfaces or other portions of the work that have or have not been covered by <br />geomembrane, at no additional cost to CC &V. <br />If any moisture is allowed to collect under the geomembrane prior to or after final seaming <br />and softens the Bedding Fill, the geomembrane shall be removed and CONTRACTOR <br />shall recondition and recompact the Bedding Fill to meet all placement and trimming <br />SPECIFICATIONS, at no additional cost to CC &V. <br />7. CONTRACTOR shall remove all hubs and survey stakes in the Bedding Fill and backfill <br />all holes with MANAGER and CERTIFYING ENGINEER approved material. <br />8. CONTRACTOR shall verify the final thickness of Bedding Fill to determine compliance <br />with this SPECIFICATION. CONTRACTOR shall record as part of the as -built <br />documentation the location, elevation, and thickness of each Bedding Fill verification test. <br />CQA Monitor will witness all verification measurements. Areas with deficiencies shall be <br />reworked by CONTRACTOR, until acceptable measurements are obtained at no <br />additional cost to CC &V. If tests indicate the Work does not meet the requirements of the <br />SPECIFICATIONS, MANAGER and CERTIFYING ENGINEER will establish the <br />extent of the nonconforming area. The nonconforming area shall be reworked by <br />CONTRACTOR until acceptable test results are obtained at no additional cost to CC &V <br />Page 13 of 14 <br />June 19, 2012 <br />Revision 1 <br />