My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (13)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 2:35:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Append. E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 02200 <br />Earthworks <br />F. Pipe Bedding Material <br />G. Bedding Fill <br />ame0 <br />requirements of Sections 02776.0 and 02777.0 of these SPECIFICATIONS, and recover, at <br />no cost to CC &V. <br />7. CONTRACTOR shall place Drain Cover Fill at a rate such that the geomembrane liner is <br />not exposed to ultraviolet light for more than 180 days. <br />8. CONTRACTOR shall provide close continuous monitoring at the point of placement <br />during the placement of the Drain Cover Fill over geosynthetics. <br />9. CONTRACTOR shall verify the final thickness of Drain Cover Fill to determine <br />compliance with this SPECIFICATION. CONTRACTOR shall record verification <br />location, elevation, and thickness. CQA Monitor shall witness all verification <br />measurements. CONTRACTOR will submit a method of verifying Drain Cover Fill depth <br />to MANAGER for approval. Grade markers shall be placed on a 50 -by -50 -foot grid with <br />additional points required for breaks in grade. CONTRACTOR shall remove all grade <br />markers under supervision of CQA Monitor after verification measurements have been <br />approved by MANAGER and CERTIFYING ENGINEER and will backfill holes with <br />Drain Cover Fill. Areas with deficient thickness shall be reworked by CONTRACTOR, <br />until acceptable measurements are obtained. If MANAGER or CERTIFYING <br />ENGINEER suspects the occurrence of any damage to the underlying geosynthetics, <br />MANAGER will instruct CONTRACTOR to remove Drain Cover Fill to expose the <br />geosynthetics. CONTRACTOR shall uncover, repair any observed damage of the <br />underlying geosynthetics, in accordance with the repair requirements of Sections 02776.0 <br />and 02777.0 of these SPECIFICATIONS and recover, at no cost to CC &V. <br />10. CONTRACTOR will provide adequate illumination as approved by MANAGER, if Drain <br />Cover Fill placement is carried out at night. A minimum of 2 -foot candles measured at the <br />synthetic liner shall be used when Drain Cover Fill placement is carried out at night. <br />1. CONTRACTOR shall compact the Pipe Bedding Material requiring compaction to at least <br />95 percent of the maximum dry density as determined by the Standard Proctor density test <br />(ASTM D698), and a moisture content 3 percent below and 3 percent over the optimum <br />moisture content. <br />2. CONTRACTOR shall place Pipe Bedding Material in maximum 12 -inch loose lifts. Pipe <br />Bedding Material will be worked under pipe haunches by hand to provide uniform support <br />of the piping. <br />3. Native material used for backfilling the remaining portion of the excavation shall be placed <br />in 12 -inch to 18 -inch loose lifts, and compacted by wheel rolling with light, rubber tired or <br />other light compaction equipment, as approved by CERTIFYING ENGINEER. <br />1. Bedding Fill shall be placed within the limits of the PSES site earthworks project as shown <br />on the DRAWINGS. <br />2. CONTRACTOR shall place and compact the Bedding Fill in loose lifts such that the <br />compacted lift thickness is a minimum of 12- inches. CONTRACTOR shall condition the <br />Bedding Fill to allow a surface that does not cause rutting or other deleterious effects. The <br />Page 12 of 14 <br />June 19, 2012 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.