My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (13)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 2:35:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Append. E, Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amecP <br />topographic features (i.e., toe of slope, crest of slope, breaks in grade), unless otherwise directed by <br />MANAGER. The Record Drawings shall include elevations and locations for the following: <br />• Diversion channel plan and profile view along the diversion channel alignment <br />• Soil Liner Fill plan view showing the limits of the Process Solution Enhancement <br />System site footprint, with contours of the Soil Liner Fill surface on a 10 -foot <br />contour interval, including the regraded ore slopes and end berms <br />• Perimeter access roads <br />In addition, the Colorado licensed surveyor will provide a surveyor's certificate to be submitted in the <br />Construction Certification Report. <br />C. Submittal: <br />CONTRACTOR will submit completed as -built documentation within seven (7) calendar days upon <br />completion of the work in the following manner: <br />1. Submit two (2) hard copies to the MANAGER. <br />2. Submit two (2) non - reproducible copies to the MANAGER in electronic form on <br />compact disks (CD) or DVD's and in an AutoCAD compatible format. <br />D. The CONTRACTOR will be responsible for performing the following survey activities associated <br />with the Construction Certification Report: <br />1. Provide northing, easting, and elevation for all Soil Liner Fill depth verifications. <br />2. Provide northing, easting, and elevation for geomembrane panel intersections and <br />destructive samples. <br />3. Provide continuous northing, easting, and elevation reference for field testing and <br />sampling location identification. <br />4. Provide depth verification for Drain Cover Fill on a 50 -foot by 50 -foot grid with <br />additional survey points at all breaks in grade. <br />Northings, eastings, and elevations for Items 1, 2 and 3 will be performed on a daily basis and results <br />will be provided to the MANAGER in both electronic and hardcopy format within 24 hours of <br />performing the survey. <br />* ** END OF SECTION * ** <br />Section 01050 Page 2 of 2 <br />Construction Staking <br />June 19, 2012 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.