Laserfiche WebLink
7.05 WEEKLY PROGRESS REPORTS: <br />Section 01400.1 Page 7 of 10 <br />Earthworks CQA Plan <br />amec( <br />7.02 SOILS OBSERVATION AND TESTING FORMS: <br />The CQA Monitor will document soils observations on forms that generally include the following <br />information: <br />• date, project name, location, and weather data, including high and low daily temperatures; <br />• a site plan showing work areas and test locations; <br />• descriptions of ongoing construction detailing work areas and equipment utilized by <br />CONTRACTOR; <br />summary of test results and samples obtained, with locations and elevations; <br />resolutions of deficient test results; <br />test equipment calibrations, if necessary; <br />summary of meetings held; and <br />signature or initials of the CQA Monitor. <br />7.03 PHOTO DOCUMENTATION: <br />The CQA Monitor shall photograph all phases of construction. Photographs shall be identified by location, <br />time, date, and name of the CQA Monitor taking the photograph. <br />7.04 DESIGN AND SPECIFICATION CHANGES: <br />During construction, the need to address DESIGN and SPECIFICATION changes, modifications, or <br />clarifications may arise. In such cases the CQA Monitor shall notify the MANAGER, which shall notify the <br />DESIGN ENGINEER and the CERTIFYING ENGINEER. DESIGN and SPECIFICATION changes <br />shall only be made with written agreement from the MANAGER and DESIGN ENGINEER. <br />The CQA Monitor shall prepare weekly progress reports summarizing all construction and quality assurance <br />activities. This report shall be submitted to MANAGER and shall include the following information: <br />• date, project name, and location; <br />• summary of construction related activities; <br />• summary of samples taken and test results; <br />• summary of deficiencies and/or defects and resolutions; and, <br />• signature of the CQA Monitor. <br />June 19, 2012 <br />Revision 1 <br />