Laserfiche WebLink
CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed, assisted, and performed testing during the placement of SLF for the PSES project. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue SLF placement within the PSES footprint. <br />Subgrade acceptance prior to geomembrane deployment within the PSES footprint. <br />Geomembrane installation within the PSES footprint. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CCBV: <br />CC&V held a weekly construction meeting on May 8, 2012. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly <br />May 12, 2012. n <br />Joseph Hickey, CQA Mon <br />Approved By: <br />our findings and observations for the week ending <br />Date: May 12, 2012 <br />Date: �l��114'yfZ <br />PSES Weekly Report WE 05.12.2012 <br />