My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (11)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 1:51:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Section 1- Cover to Append. B.2 Doc. Photos.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2.2 CQA/CQC Monitoring of Geosynthetics Installation <br />AMEC provided CQA monitoring of geosynthetics used for the Process Solution <br />Enhancement System. CQA services provided by AMEC consisted of performing <br />geosynthetics inventory and checking quality control certifications prior to geosynthetics <br />deployment. AMEC performed geosynthetics CQA activities in accordance with the <br />Geosynthetics CQA Plan (Section 1400.2 of the Specifications; see Appendix E). <br />Geosynthetics CQA activities performed by AMEC included: <br />• Observation and documentation of geomembrane deployment, trial <br />seams, seaming, destructive testing, and non - destructive testing <br />(pressure tests and vacuum tests); <br />• Performing conformance testing of geomembrane; <br />• Measuring geomembrane panel thickness and confirming adequate panel <br />overlap; <br />• Visually inspecting geomembrane sheet quality, sheet grinding, seam <br />alignment, and continuity; and <br />• Retaining archive samples of geomembrane destructive tests. <br />1.3 Project Coordination <br />ame0 <br />AMEC CQC and CQA activities were directed by the AMEC Project Resident. The AMEC <br />Project Resident (CQA Supervisor) for the construction of the Process Solution <br />Enhancement System for the period October 2011 to July 2012 was Mr. Joseph D. Hickey. <br />The Certifying Engineer and Project Manager, Mr. Jay Janney- Moore, P.E., or his <br />representative, Mr. Ronald Arlian, Project Sponsor, made periodic site visits to resolve <br />technical issues and to review AMEC activities. Appendix C presents a summary of the <br />AMEC staff on -site during the period of October 2011 through July 2012. <br />Representatives of CC &V, Ames, Lone Star, and AMEC conducted daily, weekly, and <br />preconstruction coordination meetings throughout the construction period. <br />AMEC Environment & Infrastructure, Inc. <br />2000 S Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www amec.com 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.