Laserfiche WebLink
5.4 GCL QC Documents <br />ame0 <br />GCL installed to prevent infiltration into the Process Solution Enhancement System was <br />manufactured by CETCO of Hoffman Estates, Illinois. The Quality Control Certificate for the <br />GCL installed at the Process Solution Enhancement System is presented in Appendix 1.7 <br />and meets project specifications. <br />5.5 Geocell QC Documents <br />Geocell used for erosion prevention within the Process Solution Enhancement System was <br />manufactured by Presto Geosystems of Appleton, Wisconsin. The Quality Control Certificate <br />for the geocell installed at the Process Solution Enhancement System is presented in <br />Appendix 1.8 and meets project specifications. <br />AMEC Environment & Infrastructure, Inc. <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec.com 25 <br />