My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (11)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/7/2013 1:51:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, (PSES)- Section 1- Cover to Append. B.2 Doc. Photos.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
geomembrane manufacturer also performed density and melt index tests of the resin <br />supplied by Chevron Phillips Chemical Company to verify material properties prior to <br />geomembrane manufacture. The QC certificates provided by the resin manufacturer are <br />presented in Appendix 1.3. <br />5.2.2 Roll QC Certificates <br />ame0 <br />Lone Star provided QC certificates for each roll (approximately every 10,000 square feet) of <br />LLDPE geomembrane used for the project, exceeding the required minimum frequency of <br />one per 50,000 square feet of geomembrane. AMEC reviewed the QC certificates to verify <br />conformance of the geomembrane to the project requirements. Geomembrane was placed <br />only when complete QC documentation was provided and AMEC determined that test <br />results met or exceeded project specifications. The geomembrane roll QC certificates are <br />presented in Appendix 1.4. <br />5.2.3 Welding Rod QC Certificates <br />Welding rod certification consisted of QC documents for the resin used to manufacture the <br />welding material for the Cresson Project. The welding material used on this project was <br />produced from five (5) batches of resin. AMEC's review of the QC certification indicates that <br />the resin used to manufacture the welding material met project specifications. The welding <br />rod QC certificates are presented in Appendix 1.5. <br />5.3 Geotextile QC Documents <br />Geotextile used to construct the Stormwater Control System collection basin was <br />manufactured by TenCate of Pendergrass, Georgia. AMEC's review of the QC certificates <br />indicates that the geotextile met project specifications. Geotextile QC certificates are <br />presented in Appendix 1.6. <br />AMEC Environment & Infrastructure, Inc <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www.amec.com 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.