My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_PERMIT FILE - P2012018
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2012018
>
2012-12-27_PERMIT FILE - P2012018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:40 PM
Creation date
1/3/2013 3:18:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2012018
IBM Index Class Name
PERMIT FILE
Doc Date
12/27/2012
Doc Name
NOI APPLICATION, FORM 2
From
ROYAL USA INC
To
DRMS
Email Name
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Provide plant name and seeding rate <br />7 (FORM 2 - Public filing) <br />12. List the seed mixture to be used in the re- establishment of vegetation. See the attached seed mixture calculation to obtain <br />PLS /acre. For assistance with formulating seed mixtures and rates, contact the local NRCS if on private land, BLM /USFS if <br />on public land or State Land Board if on state land. <br />Plant Name <br />See Appendix B <br />Seeding Rate (PLS /acre) <br />B. Describe the method for seed bed preparation, and application method for grass /forb seeding: <br />Following reclamation, the surface is back - dragged with the toothed loader bucket <br />or equivalent, seed is hand broadcast and either back - dragged again, hand raked <br />or dragged over by chain link. See Appendix B for BLM seeding <br />V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br />3. Reclamation measures shall be fulfilled in a timely manner and completed within five (5) years of completion of prospecting <br />activities. <br />4. The prospecting operations described in this Notice will be conducted in such a manner as to minimize surface disturbances. <br />In addition to the measures required in Rule 5, precautions to be taken include: <br />A. Confinement of operations to areas near existing roads or trails, where practicable. Existing roads which are to remain as <br />permanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre - <br />prospecting condition; <br />B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br />stream channel. Drill cuttings must be spread to a depth no greater than one -half (1/2) inch or buried in an approved <br />disposal pit; <br />
The URL can be used to link to this page
Your browser does not support the video tag.