Laserfiche WebLink
BUCKLEN EQUIPMENT CO PIT <br />MAJOR DISTURBANCE <br />Item <br />Return mined slopes to 3H:1V <br />Scarify prior to placement of topsoil <br />Spread 12" topsoil <br />Seeding, fertilizing, mulching <br />Re- seeding <br />Trees <br />Shrubs <br />Notes /Description <br />Scarify prior to placement of topsoil <br />Spread 12" topsoil <br />Seeding, fertilizing, mulching <br />Re- seeding (25 %) <br />BUCKLEN EQUIPMENT CO <br />ID# M- 1982 -131 I Technical Revision <br />Unit Quantity Unit Price Extended Unit Price <br />CY 30,000 $ 1.50 <br />Acre 0.56 $ 725.00 <br />CY 2,157 $ 1.25 <br />$ 1.50 <br />Acre 1.56 $ 500.00 <br />$ 525.00 <br />Acre 0.39 $ 500.00 <br />$ 525.00 <br />Each 5 $ 40.00 <br />Each 10 $ 25.00 <br />Total <br />$ 45,000.00 <br />$ 406.00 <br />$ 3,146.25 <br />$ 3,235.50 <br />$ 780.00 <br />$ 819.00 <br />$ 195.00 <br />$ 204.75 <br />$ 200.00 <br />$ 250.00 <br />$ 4,977.25 <br />$ 50,115.25 <br />0.56 acres of overburden /topsoil stockpiles <br />1.56 acres shoreline and stockpile areas <br />1.0 acres graded shoreline above waterline. <br />0.56 acres where overburden /topsoil stockpiles have been <br />removed <br />0.39 acres non - acceptable germination <br />Applegate Group, Inc. <br />